PROCUREMENT OF DISTRIBUTION TRANSFORMERS FOR MAINTENANCE USE (BAC Control No. 19-2023);SUPPLY AND DELIVERY OF SIX (6) UNITS 4X4 PICK-UP VEHICLES FOR AREA MAINTENANCE USE (BAC Control No. 23-2023);SUPPLY AND DELIVERY OF TOOLS FOR AREA 3 MAINTENANCE USE (BAC Control No. 25-2023);SUPPLY AND DELIVERY OF TOOLS FOR AREA 4 MAINTENANCE USE (BAC Control No. 26-2023);SUPPLY AND DELIVERY OF CONSTRUCTION MATERIALS FOR NEW CONNECTION (UNDER MAGNA CARTA) USE (BAC Control No. 27-2023);SUPPLY AND DELIVERY OF STEEL POLES FOR REPLACEMENT OF ROTTEN POLES FOR 69KV SUBTRANSMISSION LINE (BAC Control No. 28-2023);SUPPLY OF LABOR AND MATERIALS FOR THE CONSTRUCTION OF FEEDER 54 – PHASE 2 LINE EXTENSION, BUAYAN TO CROSSING BIALONG, MLANG (BAC Control No. 29-2023) | Cotelco Inc.
PROCUREMENT OF DISTRIBUTION TRANSFORMERS FOR MAINTENANCE USE (BAC Control No. 19-2023);SUPPLY AND DELIVERY OF SIX (6) UNITS 4X4 PICK-UP VEHICLES FOR AREA MAINTENANCE USE (BAC Control No. 23-2023);SUPPLY AND DELIVERY OF TOOLS FOR AREA 3 MAINTENANCE USE (BAC Control No. 25-2023);SUPPLY AND DELIVERY OF TOOLS FOR AREA 4 MAINTENANCE USE (BAC Control No. 26-2023);SUPPLY AND DELIVERY OF CONSTRUCTION MATERIALS FOR NEW CONNECTION (UNDER MAGNA CARTA) USE (BAC Control No. 27-2023);SUPPLY AND DELIVERY OF STEEL POLES FOR REPLACEMENT OF ROTTEN POLES FOR 69KV SUBTRANSMISSION LINE (BAC Control No. 28-2023);SUPPLY OF LABOR AND MATERIALS FOR THE CONSTRUCTION OF FEEDER 54 – PHASE 2 LINE EXTENSION, BUAYAN TO CROSSING BIALONG, MLANG (BAC Control No. 29-2023)